Main Content Anchor

Lachlan's Line bridge installation

Published on 17 February 2020

Landcom, the NSW Government's land and property developer, has advised that there will be further road closures in North Ryde as it completes the final stages of the Lachlan's Line pedestrian and cycle bridge installation. 

There are two more sections of the bridge to install, which will require the temporary closure of lanes on Delhi Road and/or the M2 Motorway off-ramp and on-ramps to provide room for the crane and bridge segments to be lifted.

The closures will occur between 21 February and 24 February and 28 February and 2 March.

The full details of the road closures are as follows:

From 8pm Friday 21 February to 5am Monday 24 February

  • Closure of M2 Motorway westbound on-ramp at Delhi Road and one Delhi Road eastbound lane. Motorists are advised to use the Herring Road on-ramp to access the M2 Motorway.

From 8pm Saturday 22 February to 1pm Sunday 23 February

  • Closure of Delhi Road in both directions between Julius Avenue West and Epping Road. Motorists are advised to detour via the Pacific Highway and either Ryde Road or Epping Road.
  • Closure of M2 Motorway eastbound off-ramp right-turn lanes (from 7pm). Motorists are advised to use Lane Cove Road exit ramp to access Epping Road.

From 8pm Friday 28 February to 5am Monday 2 March

  • Closure of M2 Motorway westbound on-ramp at Delhi Road. Motorists are advised to use the Herring Road on-ramp to access the M2 Motorway.

The Lachlan's Line pedestrian and cycle bridge is expected to open in March/April 2020.

For more information visit the Lachlan's Line page on the Landcom website.

 
Last updated on 28 February 2020